As part of a wider renovation team, we were appointed to deliver specialist works across six floors of this iconic London hotel.
Project Brief
Works were delivered within the constraints of an operational hospitality environment with precision and consistency.
Scope of Works
- Specialist plastering package across six floors.
- Corridor flooring installation and finishing transitions.
- Detailed joinery finishes to guest-facing areas.
- Live-environment coordination with concurrent trades.
World-Class Hospitality Standards
Our scope included plastering, corridor flooring, and detailed joinery finishes in coordination with other trades.
Challenges & Delivery
Operational hotel constraints required careful timing, protection, and cross-trade sequencing to maintain quality and minimise guest disruption.
Outcomes
Precision
Specialist finishes delivered to exacting standards.
Coordination
Packages integrated smoothly with wider renovation teams.
Continuity
Works progressed in a live hospitality setting.